All posts by admin

Notice of Sanitary Sewer Smoke Testing

 

SMOKE TESTING WILL 

BEGIN ON

THURSDAY,

NOVEMBER 5TH

Notice of Sanitary Sewer Smoke Testing

Streets/Areas affected by this notice:

Aiken Road ( Beach Ridge – Pump Station) 

Creekview  (Tonawanda Creek / NCSD connection)  

Iroquois (Tonawanda Creek to NCSD connection) 

Hidden Oak (Phase 1) Tonawanda Creek to NCSD Connection) 

Pendale Subdivision 

Ridgeview Subdivision 

In the upcoming weeks, a field crew from KHEOPS Architecture, Engineering and Survey, DPC will conduct smoke testing of your neighborhood’s sanitary sewer system. Inspection crews will be opening manholes in the streets and easements. Smoke testing of the sewer lines will be conducted to locate breaks and defects within the system. The testing will consist of placing a machine with liquid smoke over a manhole and blowing the smoke into the sewer lines.

Any smoke that you may see coming from the vent stacks on houses or holes in the ground during testing is WHITE, NON-TOXIC, HAS LITTLE ODOR, CREATES NO FIRE HAZARDS, & WILL DISSIPATE RAPIDLY.

IF YOU SEE ANY SMOKE INSIDE YOUR HOME, PLEASE NOTIFY THE FIELD CREW IMMEDIATELY.

This non-invasive test does not typically require private property access and will take place weekdays, 7am – 5 pm.

FREQUENTLY ASKED QUESTIONS:

What is the purpose of smoke testing and how will it be conducted? Smoke testing is used to find possible leaks in the sanitary sewer system. During this test, non‐toxic, artificially created smoke (like a fog machine at a concert) is blown into access points (manholes) in the pipe. This smoke will escape through defects in the pipe, such as holes or cracks, or through illicit connections such as roof leaders, and be visible above ground. Smoke coming from plumbing vents and manhole rims is normal during this test. Any defects will be noted and may also be photographed.

Do I need to be at home during smoke testing? No.

What do I need to do to prepare for smoke testing? Please make sure that all drain traps under sinks, toilets, washing facilities and floor drains have water in them. To fill them, simply run each faucet for 30 to 60 seconds, flush toilets.

What should I do if I have pets and will not be home during smoke testing? The smoke is not harmful to pets. It would be a good idea to leave several windows partially open for ventilation, should any smoke enter your home. If you have proper plumbing connections and all of the drain traps have water in them, there should be no smoke entering your home.

Is the smoke harmful to humans or furnishings? No, it is not harmful to your health, clothing or furniture.

What should I do if smoke gets into my home and how long will it take to clear? If smoke enters your home during testing, please notify the field crew performing the test outside. Open windows or doors to allow ventilation and note the location of the smoke. If the smoke can enter through faulty plumbing, the potential exists for dangerous sewer gases to enter your home. Smoke inside your home can help identify bad plumbing connections or a cracked seal around a toilet. Smoke alarms may sound. The smoke will clear quickly.

Can smoke cause problems in the sanitary sewer system? No. The smoke is a vaporous substance that is blown through the system to detect leaks and stormwater inflow defects.

Is there a website that I can visit for more information? Yes. There is a video on the website http://hurcotech.com/product/ripcord-smoker.

For specific scheduling information, please contact :

Jill Sawyer— KHEOPS- 716.849.8739 x2197

For any additional questions, please contact:
David Britton, PE – GHD Consulting- 716-856-2142

Thank you for your cooperation to help improve your sewer services.

Click here for additional information:  Smoke-Testing-MSDS

OPEN POSITION – Water & Sewer Dept. Laborer

CLICK HERE FOR JOB DESCRIPTION

 

Department:  Water & Sewer Department

Title:  Laborer

Schedule:  Full-Time

Benefits:  Yes

Compensation:  Per Collective Bargaining Agreement

Residency:  Must be a resident of the Town of Pendleton

Approved:  August 10, 2020

Deadline:  September 15, 2020

Description:  The Town Board of the Town of Pendleton is soliciting applicants for the full-time position of laborer assigned to the Water & Sewer Department. See attached Civil Service job descriptions for  specifics of the job and applicant eligibility.

How to Apply:  Call or visit the Public Works Garage at 625-8033 for an application.

IMPORTANT WATER BILL REMINDER – $100 SURCHARGE

 

IMPORTANT WATER BILL REMINDER – $100 SURCHARGE

Just a reminder that there is a message on the July water bill every year stating that there will be a $100.00 surcharge for any balances not paid by 4:00 p.m. on the third Friday of September.  (It was extended one week this year due to the delay in mailing out the July water bills.)

This surcharge is for unpaid balances that are turned over to the Niagara County Tax Department every year on October 1st.  This is not new.  If you pull your prior year July water bill you will see the same message.  This only happens once a year so you may have forgotten the message being on previous water bills.

Your water bill is due on 09/01/2020 without penalty (current total).

On 09/02/2020 a 10% penalty is assessed (gross total with penalty) and that amount should be paid if you do not make the 09/01/2020 due date.

If you do not pay by 4:00 on Friday September 25th there will be a $100.00 surcharge on top of the 10% penalty.

Remember that you can now pay your water bill online at: www.pendletonny.us  with a credit or debit card.  We cannot take credit card payments over the phone.  If you type in the link above, it will bring you to the Town of Pendleton website.  On the Home page look to the left and you will see Pay your Water Bill Online in red letters. Just click on the link, have your water bill in front of you and follow the prompts.  There is a small convenience fee, just to let you know.

Please remember, NO PAYMENTS WILL BE ACCEPTED after 4:00 on Friday September 25th.

Not even mail with a postmark or payments put in the lock box at the back of the Town Hall building.  Any mail or lock box payments received after 4:00 on Friday, September 25th will be credited to your October bill.

Please contact the Water Billing Department at 716-625-8833, ext. 111, if you have any questions.

Thank you.

 

 

TONAWANDA CREEK ROAD CONSTRUCTION PROJECT

TONAWANDA CREEK ROAD CONSTRUCTION PROJECT

Construction work on Tonawanda Creek Road began on Monday, March 30th. Sections of Tonawanda Creek Road, between Campbell Blvd and Irish Road, will be closed daily for seven (7) days to replace cross road culverts. These road closures will start a 7:00 AM and will be opened back up by the end of the day and open to traffic at night.

This work is expected to last one to two weeks after which the road will be closed to east bound traffic for the duration of the project.